Knitting Project Progess
Aug. 10th, 2020 01:55 pmI seem to have more projects in hand at present than usual so I thought I'd do a progress report post on the knitting projects I have on needles at present.
1. 1897 star and leaves circular shawl

The body of the shawl is more than half knit, but I ran of out yarn a month ago. The yarn was supposed to be back in stock in the latter part of August, but that date has slipped to Labor Day weekend. I hope it doesn't slip more than that.
I actually wouldn't be too excited about working on it right now while the temperatures are over 100. It has gotten big enough that it's rather a lap full of wool, which is not very agreeable at present.
2. 1930's bedjacket/cardigan

I finished the first sleeve over the weekend and cast on the second one. I'm on my third ball of yarn. This one is progressing nicely, partly because it's the project I usually work on at lunchtime after I've finished eating.
I still have a long way to go because I still have to knit the back, the second side of the front, and the second sleeve. Yes, I know knitting the sleeves before the body is weird, but I was trying to gauge how much more yarn I would need after I used more on the front than I had anticipated.
3. 1939 suimsuit

I haven't done a lot with this one yet. In a fit of backwardness, I started this even though I only had the contrast yarn and not the main yarn so I started with one of the brassiere and strap pieces and am working my way down the strap. I still have another foot to go to finish this piece. I ordered the yarn for the main body of the swimsuit over the weekend and will start on it after it arrives.
My main project continues to be my cross-stitched Christmas stocking, but if I get tired of that, I expect the swimsuit will bubble up and take over my evenings for a bit.
1. 1897 star and leaves circular shawl

The body of the shawl is more than half knit, but I ran of out yarn a month ago. The yarn was supposed to be back in stock in the latter part of August, but that date has slipped to Labor Day weekend. I hope it doesn't slip more than that.
I actually wouldn't be too excited about working on it right now while the temperatures are over 100. It has gotten big enough that it's rather a lap full of wool, which is not very agreeable at present.
2. 1930's bedjacket/cardigan

I finished the first sleeve over the weekend and cast on the second one. I'm on my third ball of yarn. This one is progressing nicely, partly because it's the project I usually work on at lunchtime after I've finished eating.
I still have a long way to go because I still have to knit the back, the second side of the front, and the second sleeve. Yes, I know knitting the sleeves before the body is weird, but I was trying to gauge how much more yarn I would need after I used more on the front than I had anticipated.
3. 1939 suimsuit

I haven't done a lot with this one yet. In a fit of backwardness, I started this even though I only had the contrast yarn and not the main yarn so I started with one of the brassiere and strap pieces and am working my way down the strap. I still have another foot to go to finish this piece. I ordered the yarn for the main body of the swimsuit over the weekend and will start on it after it arrives.
My main project continues to be my cross-stitched Christmas stocking, but if I get tired of that, I expect the swimsuit will bubble up and take over my evenings for a bit.
no subject
Date: 2020-08-10 09:17 pm (UTC)no subject
Date: 2020-08-11 12:29 pm (UTC)no subject
Date: 2020-08-11 03:48 pm (UTC)A 1930s bathing suit sounds like it could be perfectly paired with beach pajamas and would be good for outside at CoCo.
no subject
Date: 2020-08-13 03:33 am (UTC)It would be fun to wear the bathing suit to CoCo. We'll see. I'll have to find somewhere to wear it. I think the Phoenix costume people said they were thinking about doing early 20th century bathing suits for something so maybe that would be an opportunity too.
no subject
Date: 2020-08-11 02:20 am (UTC)no subject
Date: 2020-08-11 12:30 pm (UTC)no subject
Date: 2020-08-12 03:25 pm (UTC)no subject
Date: 2020-08-13 03:34 am (UTC)no subject
Date: 2020-08-16 03:38 pm (UTC)no subject
Date: 2020-08-17 11:28 pm (UTC)