atherleisure (
atherleisure) wrote2020-08-10 01:55 pm
Entry tags:
Knitting Project Progess
I seem to have more projects in hand at present than usual so I thought I'd do a progress report post on the knitting projects I have on needles at present.
1. 1897 star and leaves circular shawl

The body of the shawl is more than half knit, but I ran of out yarn a month ago. The yarn was supposed to be back in stock in the latter part of August, but that date has slipped to Labor Day weekend. I hope it doesn't slip more than that.
I actually wouldn't be too excited about working on it right now while the temperatures are over 100. It has gotten big enough that it's rather a lap full of wool, which is not very agreeable at present.
2. 1930's bedjacket/cardigan

I finished the first sleeve over the weekend and cast on the second one. I'm on my third ball of yarn. This one is progressing nicely, partly because it's the project I usually work on at lunchtime after I've finished eating.
I still have a long way to go because I still have to knit the back, the second side of the front, and the second sleeve. Yes, I know knitting the sleeves before the body is weird, but I was trying to gauge how much more yarn I would need after I used more on the front than I had anticipated.
3. 1939 suimsuit

I haven't done a lot with this one yet. In a fit of backwardness, I started this even though I only had the contrast yarn and not the main yarn so I started with one of the brassiere and strap pieces and am working my way down the strap. I still have another foot to go to finish this piece. I ordered the yarn for the main body of the swimsuit over the weekend and will start on it after it arrives.
My main project continues to be my cross-stitched Christmas stocking, but if I get tired of that, I expect the swimsuit will bubble up and take over my evenings for a bit.
1. 1897 star and leaves circular shawl

The body of the shawl is more than half knit, but I ran of out yarn a month ago. The yarn was supposed to be back in stock in the latter part of August, but that date has slipped to Labor Day weekend. I hope it doesn't slip more than that.
I actually wouldn't be too excited about working on it right now while the temperatures are over 100. It has gotten big enough that it's rather a lap full of wool, which is not very agreeable at present.
2. 1930's bedjacket/cardigan

I finished the first sleeve over the weekend and cast on the second one. I'm on my third ball of yarn. This one is progressing nicely, partly because it's the project I usually work on at lunchtime after I've finished eating.
I still have a long way to go because I still have to knit the back, the second side of the front, and the second sleeve. Yes, I know knitting the sleeves before the body is weird, but I was trying to gauge how much more yarn I would need after I used more on the front than I had anticipated.
3. 1939 suimsuit

I haven't done a lot with this one yet. In a fit of backwardness, I started this even though I only had the contrast yarn and not the main yarn so I started with one of the brassiere and strap pieces and am working my way down the strap. I still have another foot to go to finish this piece. I ordered the yarn for the main body of the swimsuit over the weekend and will start on it after it arrives.
My main project continues to be my cross-stitched Christmas stocking, but if I get tired of that, I expect the swimsuit will bubble up and take over my evenings for a bit.
no subject
no subject
no subject
A 1930s bathing suit sounds like it could be perfectly paired with beach pajamas and would be good for outside at CoCo.
no subject
It would be fun to wear the bathing suit to CoCo. We'll see. I'll have to find somewhere to wear it. I think the Phoenix costume people said they were thinking about doing early 20th century bathing suits for something so maybe that would be an opportunity too.
no subject
no subject
no subject
no subject
no subject
no subject