Jan. 24th, 2016

Milestones

Jan. 24th, 2016 08:08 am
atherleisure: (reader)
I hit two milestones this week with needlework projects.

(1) My dress is now a dress; it's complete except for trim and draping up the skirt. I'm very satisfied with it. Now I've got the trim materials in hand so I should be able to progress as time permits.

(2) My hood now fits comfortably on my knitting needles. I've gotten through the 7" of plain knitting 220 stitches wide and cast off my hundred stitches and am working through the section where you narrow six stitches per row. I calculated that I have something like fifty rows left, and each row is shorter than the last.

I might have an event to wear my hood to also so that's always a happy thought.

Profile

atherleisure: (Default)
atherleisure

January 2026

S M T W T F S
    1 23
45 678910
11121314151617
18192021222324
25262728293031

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Jan. 8th, 2026 07:05 am
Powered by Dreamwidth Studios