Jun. 28th, 2024

atherleisure: (Default)
I started the Studio Cardigan. It has so many cables. There are two charts, and every right side row has multiple crossings. It's very good car knitting. I'm 40% of the way from the hem to the bottom of the armscyes.

I also finished the back of the 1940's Glenridge sweater and started the front. It's good reading knitting.

I tried to post a picture, but Flickr and my phone aren't playing nicely today so I'll have to try again later.

Profile

atherleisure: (Default)
atherleisure

July 2025

S M T W T F S
   12 345
67 8 910 11 12
1314151617 18 19
202122 23242526
2728 293031  

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Jul. 30th, 2025 06:50 pm
Powered by Dreamwidth Studios