State of Affairs
Nov. 9th, 2013 08:23 amI haven't really posted progress on projects lately other than the 18th century jacket that I finished right before Hallowe'en. So here goes.
I finished my husband's cross-stitched lady about three weeks ago and got her to the framer in fairly short order. I got the call yesterday that she's ready so I should be picking her up Monday, barring any more pressing errands arising. I guess that means my husband is getting his Christmas present quite early, but he wants her up on the wall by Thanksgiving.
Since then I've made some good progress on my 1784 cross-stitched garters. They're not a high priority for me, but they're good for working on when watching TV with my husband. I've got enough done of one of the quatrefoils that it's starting to look a lot less garish and a lot more like the originals at the MFA.
On 1 November I continued my tradition of starting to work on Christmas ornaments for the children. I make each one an ornament each year. Thus far they've been felt applique ornaments, but I finally ran them out after making MT's ornament this year. Neither JoAnn's nor Michael's has carried them for the last couple of years so I'm taking that as sign that I should go in a different direction. I knitted T a miniature stocking and am knitting M and E little snowmen. The snowmen themselves are knit and stuffed and half of their clothes are knit. Now I just need to finish knitting the clothes, bead their faces, and dress them.
My 1937 cami-knickers are progressing slowly but surely. I'm nearly finished with the waist ribbing on the second body piece. Just 69 more rows, and I'll be ready to assemble them.
Finally, I started making wool pants, a purely modern, purely utilitarian project. One of the wools I had bought turned out to be too lightweight for pants (the dangers of ordering online, but I don't really have any other options) so the plan was changed, and it is becoming a skirt. The skirt is one piece, and the bias is hanging out even as I type. The pants aren't so far along, but one pair has the zipper in so the rest is pie on that pair. The other is still pinned to the pattern pieces.
It sounds like I've been doing a lot. Now if only it didn't mean that I have a whole flock of partially-finished things lying around! With luck, I'll finish the ornaments and skirt this weekend and make good progress on the pants through the week.
I finished my husband's cross-stitched lady about three weeks ago and got her to the framer in fairly short order. I got the call yesterday that she's ready so I should be picking her up Monday, barring any more pressing errands arising. I guess that means my husband is getting his Christmas present quite early, but he wants her up on the wall by Thanksgiving.
Since then I've made some good progress on my 1784 cross-stitched garters. They're not a high priority for me, but they're good for working on when watching TV with my husband. I've got enough done of one of the quatrefoils that it's starting to look a lot less garish and a lot more like the originals at the MFA.
On 1 November I continued my tradition of starting to work on Christmas ornaments for the children. I make each one an ornament each year. Thus far they've been felt applique ornaments, but I finally ran them out after making MT's ornament this year. Neither JoAnn's nor Michael's has carried them for the last couple of years so I'm taking that as sign that I should go in a different direction. I knitted T a miniature stocking and am knitting M and E little snowmen. The snowmen themselves are knit and stuffed and half of their clothes are knit. Now I just need to finish knitting the clothes, bead their faces, and dress them.
My 1937 cami-knickers are progressing slowly but surely. I'm nearly finished with the waist ribbing on the second body piece. Just 69 more rows, and I'll be ready to assemble them.
Finally, I started making wool pants, a purely modern, purely utilitarian project. One of the wools I had bought turned out to be too lightweight for pants (the dangers of ordering online, but I don't really have any other options) so the plan was changed, and it is becoming a skirt. The skirt is one piece, and the bias is hanging out even as I type. The pants aren't so far along, but one pair has the zipper in so the rest is pie on that pair. The other is still pinned to the pattern pieces.
It sounds like I've been doing a lot. Now if only it didn't mean that I have a whole flock of partially-finished things lying around! With luck, I'll finish the ornaments and skirt this weekend and make good progress on the pants through the week.